Kemper Case Studies


Increase sand production case study

Increased Sand Production


Kemper was able to help a sand producer with the solution and equipment they needed.


decrease fines case study

Decrease Fines


Kemper manufactured chute decreased -30mm waste from 11% to 3%


chute design/build case study

Chute Design/Build


Custom hood and spoon chute minimize material breakdown.


case study graphic

Cost Effective Wash Plant

Portability of Wash Plant Provides Cost Effective Solution for 250 tph Trap Rock Operation

case study graphic

Clean Product Doubles Production

Customer wanted to sort/clean loads of process run quarry rocks witha 992 loader